Pre-installation verification
Anchor equipment, drawings and requirements before installation.
Digital commissioning
Create a digital record from installation through functional testing, issue resolution and live operation—so FM inherits evidence, not a box of files.
Why it matters
Sampling, spreadsheets and disconnected contractor records make it difficult to know whether the installed systems meet design intent—or work together.
Digital commissioning creates traceability from asset to test, issue, resolution and approval, then preserves that knowledge for operations.
Five-stage process
Anchor equipment, drawings and requirements before installation.
Capture evidence and verify readiness through structured workflows.
Validate connectivity, data quality and thresholds as systems go live.
Automate point-to-point, logic, alarm and integrated system tests.
Transfer an audit-ready record and baseline into live operations.
Not just a checklist
The same asset models and performance baselines can support fault detection, maintenance, energy management and continuous commissioning after handover.
Talk to Omnee360 about digital commissioning for a new development or major refurbishment.